Sunday, August 26, 2012

Renovation Update

Ready for flooring.

View into the old red room and the computer room (the blue room in the background).

View into the old red room.

The computer room is the same color as the entryway/mudroom.

One view of the entryway/mudroom and one of the walls in the living room.

Entryway/mudroom and front door.
Well things are still moving along; however, we've decided to wait a month to move back in so we can be sure that everything that needs to be done will get done.  With Anna's help we finished a good portion of the painting this weekend and are ready for the flooring to be installed on the first floor.  Terri and I are picking out lights and faucets, and Ken is taking a break for a week to catch up on his backlogged jobs.  If not for Ken and Anna we'd be sunk right now.  I don't know how else to relay that information, but without them we'd be looking at three or more months of work instead of one.  Hakia plans to install the tile in the upstairs bathroom this week, and Aaron will be doing electrical work in the basement.  Other than those two activities and the flooring this week will be quiet.  Doors will be delivered on Friday, and carpet gets installed on September 21.  I'm attaching some photos of the first floor rooms after they've been painted.  The front two rooms of the house (the entryway/mudroom and the computer room--the rooms carved out of the former porch) have been painted blue.  The remaining three rooms of the first floor (with the exception of the kitchen) have been painted a rich blue green.  Let us know what you think.  Look for more photos at the end of week.  We hope to be able to show you the maple floor at the end of this week--after it's been installed but before it's been sanded and sealed.  

No comments: