North wall of the master bedroom. At the advice of Gram and Pappa we added insulation between the master bedrooma and the kids room.
Tuesday, July 24, 2012
Second Floor: Ready for Sheetrock
Aladdin finished insulating the upstairs this morning, so tomorrow morning we'll be ready for the sheetrockers. Steve and Ken were in the basement most of the day taking out the main beam in the house. I tried to help and stay out of the way at the same time. They're almost finished with this task, which really is the last major task. A lot of little things remain to do on the first floor, so I'm hoping I can help with those over the next three days. Check out the new photos for our progress.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment