Sunday, July 1, 2012
Weel 8 Renovation
Things are moving along and most of the subflooring has been put down on the second floor. Jenny is going through a few recalculations upstairs so Steve can start framing first thing on Monday. I spent some time at the house on Friday and Saturday taking the plaster and laths off two and one-half walls and busting through the concrete floor in the basement with a jackhammer. All I can say is that I'm not a spring chicken anymore. We have three other 30 x 30 inch sections in the basement that have to be dug to 12 inches deep so we can pour concrete pads for the metal supports. I'm thinking I might be able to help with one more, but we'll see. The weather last week was brutal, and this week isn't going to be much better. Highs in the high 90s, maybe even 100. The HVAC contractor, insulators, and sheetrockers will be in this week to take measurements for materials. They should be getting in later this week or early next week. Then we can get the carpet installers in to measure the upstairs and stairs. Things will be going fast and furious pretty soon. The end of July will be exciting.
Sunday, June 24, 2012
A Visit to the House
Terri dropped us at the house on Saturday, and we spent some time blowing bubbles, feeding the ducks, and sword fighting. Nini wants to be just like her brothers.
Week 7 Renovation Status
Well things continue to go well in spite of the heat and humidity. The roofer worked Friday, Saturday, and Sunday and may have a bit of work to finish up on Monday. The electrician will be at the house on Tuesday and Thursday, hopefully, and Steve, Ken, and Dan will frame in the upstairs on Tuesday and Wednesday. Terri and I removed the plaster and laths from two walls in the red room on the first floor (see before and after pictures above), and I cleaned and straightened up on the first floor. The pantry by the back door is going to be great (see picture)! What a great idea Jenny. Moving the opening between the kitchen and the living room, taking out the stack, straightening the stairs, and putting in a pantry/closet are great ideas and will make the kitchen more functional. I can't wait to get back in and reorganize.
Tuesday, June 19, 2012
The Stack is Down
Steve and Danny kicked butt today and got the chimney/stack removed all the way to the basement. Ken kept things going on the second floor so the roofer can start on Thursday. Zach, Nini, and I took a few pictures of the progress. Stay tuned for more.
Sunday, June 17, 2012
Renovation Plans
We thought we'd let everyone see the plans. Sorry that we had to resort to taking pictures of the plans, but that should give you some idea of what we're doing. I've also included a photograph of the roof sans chimney.
Saturday, June 16, 2012
End of Week 6 Update
Things are going well. The plumber started his work this past week and will be back on Monday. There were some slight adjustments because of his work, but nothing major. Danny and Steve took the chimney down to just below the second floor. It's slow going because they have to chisel through about four inches of solid 1918 concrete (see photo). Steve is going to get a slightly larger jackhammer for Monday so they can get it down below the first floor a bit quicker. I was over this morning helping Steve clean up on the second floor, and we took down a little bit of sheet rock and the balusters. When you look at the picture of the upstairs the area to the left of the stairs is going to be Nini's room and the area to the right of the stairs will be the boys' room. If all goes well, the roofer will finish next week. We're trying to figure out what color we want to paint the house so we can choose a color for the James Hardie siding and the front and back doors. We'll try to post the colors when we figure them out. More later.