Wednesday, August 15, 2012
Tuesday, August 14, 2012
Ready for Paint!
| The long and straight stairs. |
| A portion of the master bedroom (walk-in closet on the right). |
| View out of the master bedroom and into Nini's room. |
| Nini's room. |
| Future location of the bathroom vanity. |
| View of the hallway closet. |
| View into the boys room. |
| Hardie planking on the second floor with seal gray paint. The entire house eventually will be seal gray. |
| Tub and future shower. |
Saturday, July 28, 2012
New Front Steps
| The new exterior post. It just needs to be anchored, which Ken will do on Monday. |
| Steve working on the new front steps. |
| Nini enjoying donuts on the new front steps. |
| The chop saw and table saw are gone. Very few tools are left. Always a good indication that the end is near. |
| The front rooms ready for insulation and sheetrock. |
| We're getting new lighting in the kitchen. Should be much brighter. |
| Nin in the door to her new room. |
Thursday, July 26, 2012
Concrete, Jackhammer, and More Concrete
| Basement pad before the addition of concrete. |
| Basement pad filled in with concrete. |
| Exterior view of the back of the house. The corner of the house to the right is the one that needed a new concrete pier for the post. |
| Ready for conrete. |
| Concrete pad and pier. |
Subscribe to:
Posts (Atom)