Tuesday, August 14, 2012

Ready for Paint!

The long and straight stairs.

A portion of the master bedroom (walk-in closet on the right).

View out of the master bedroom and into Nini's room.

Nini's room.

Future location of the bathroom vanity.

View of the hallway closet.

View into the boys room.

Hardie planking on the second floor with seal gray paint.  The entire house eventually will be seal gray.

Tub and future shower.
The taper has finished his work, which was quite extensive, and now it's time for us to prime and paint the entire house.  We'll be getting some expert help from Anna, and we're quite happy about that.  Steve has moved to another job, but checks in periodically and helps out when needed.  Ken continues to help us, and his professionalism and friendship during this stressful time are hard to describe or measure.   We have a lot of work to do over the next three weeks, but with his help we'll accomplish everything.

Saturday, July 28, 2012

New Front Steps

The new exterior post.  It just needs to be anchored, which Ken will do on Monday.

Steve working on the new front steps.

Nini enjoying donuts on the new front steps.


The chop saw and table saw are gone.  Very few tools are left.  Always a good indication that the end is near.

The front rooms ready for insulation and sheetrock.
We're getting new lighting in the kitchen.  Should be much brighter.

Nin in the door to her new room.
Steve finished the new front steps late yesterday, and Nini and I enjoyed donuts on them this morning.  Sheetrock is delivered on Monday, and the sheetrockers should be done on the second floor on Tuesday.  The tapers come in on Wednesday or Thursday.  In the meantime Ken will be working on the exterior trim next week and securing the new posts (the last one on the interior and the replaced post on the southwest corner).  The house will start to look livable by the end of the week.

Thursday, July 26, 2012

Concrete, Jackhammer, and More Concrete

Basement pad before the addition of concrete.


Basement pad filled in with concrete.
Exterior view of the back of the house.  The corner of the house to the right is the one that needed a new concrete pier for the post.


Ready for conrete.

Concrete pad and pier.
Today was a bit tough.  Ken mixed 12 bags of concrete to fill the third hole in the basement (see photo), while I jackhammered out the concrete post on the southwest corner of the house.  I then dug a 32-inch deep hole for concrete so we could reset the corner post, which had slipped off center.  Ken mixed the concrete for the hole, and I helped guide the concrete into the hole.  We'll set the basement post and corner pier on Monday.  Aaron spent the entire day wiring the first floor, and he returns tomorrow to finish up.  Steve worked on the front steps and will be finished tomorrow.  Sheetrock comes on Monday, along with the brothers from Moscow Mills who'll hang the sheetrock.  It's all coming together.